Building on the homestead: planning and permits
Which buildings your homestead needs, where to put them, what needs permission, what you can build yourself, what it costs and how to run a site without injuries
€9
Secure checkout with Stripe · VAT included · The PDFs are in the language of this page.
Whole series: Building on the homestead, €39

In short
- One plan on paper for all buildings at once, then build by priority. No building may block the way to another.
- Before you buy materials, ask the council or county: land use (zoning), distance from boundaries and whether you need permission, a permit or nothing.
- You can build a light lean-to, a store and a fence yourself. Load-bearing walls, roofs spanning more than 4–5 m, digs deeper than 1 m and anything where people live need a professional.
- Budget = materials + tools + transport + 15–20 % contingency. Reclaimed materials save money, not time.
- Working at height and in trenches cause most serious injuries. Never alone on a roof or in a pit.
What's inside
Chapters
- What the homestead needs
- Where each building goes
- Ground and site before building
- Paperwork: what needs permission
- What you can do yourself and what needs a professional
- The project on one sheet
- Budget and materials
- Order of work and running the site
- Safety on site
- Maintenance: a building lasts as long as its roof
- Common mistakes
- Printable checklist
Worksheets
- Buildings and priorities
- Sketch of the land and buildings
- Questions for the council and professionals
- Building cost sheet
- Building calendar
- Log of cases and building work
Fields and checkboxes can be filled in with Adobe Acrobat Reader (desktop and mobile), and the calculator adds up by itself. Filling in may not work in some browsers. A print version comes with the screen PDF.
This guide in other languages: